skip to Main Content

Pilbara Constructions completed this project in 2015. It included the demolition of an existing canteen building that contained asbestos products and the beautification of a number of recreation areas around campus for student use. The beautification included grassed areas, reticulation, landscaping, paths, screening, signage & painting. The project occured across a number of sites on campus simultaneously. The project was achieved on time and on budget .

Pilbara Constructions were able to schedule the scope of works in conjunction with the shool administration in order to cause minimal disruption to the schools ongoing programs. Where sections of the project could have caused disruption, Pilbara Construcitons were able to perform these facets of the works outside of school operating hours.